PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Metal clips aroung the perimeter of the 3rd Floor Facing West (800x600).jpg Patching of Stair -2 (800x600).jpg Patching Stair -2 (800x600).jpg Roof perimeter without the steel plates to support the metal decking (800x600).jpg Started installing duct work at the 1st Floor Facing South-East (800x600).jpg Welded metal clips around the perimeter of the 4th Floor (North Elevation) (800x600).jpg
Previous pageNext page Started installing duct work at the 1st Floor Facing South-East (800x600)
Started installing duct work at the 1st Floor Facing South-East (800x600)